Tuesday, October 06, 2009

Busy Busy

yeah, maybe not so much. Apparently not busy enough to produce enough to blog about. I have been scrapping and I have been knitting, I just haven't been taking pictures of things..

in Scrapbooking.....

I did finish 'Adam's Visit'. What started out as pages within the 2005 album, turned out to be an album in and of itself. Adam is my cousin's son who we brought from Hungary to visit during the summer of 2005. Besides doing things locally, Adam and I flew out to California to visit my sister and her girls and we did all the California things from going to Hollywood, and Disneyland to learning to surf. Then only after days of returning home, we drove out to Washington D.C. to visit Alex and toured our nation's Capitol. Tons of pictures were taken during the summer and it was hard to keep them to a single album. Here are a few....







in Knitting...

I did finish my Swing Coat and am needing to block it and then assemble it. It's my first blocking job and I'm a bit nervous about it. I don't want to overdo it and then it won't fit. I'm planning on steam blocking it... pinning it down to the right size and then running a steamer over it. Maybe I'll attempt it on Thursday.

Continuing on the V-neck sweater using a lovely Noro Silk/Mohair/Wool yarn in a lively purple and blue coloration. Front and back are complete and started yesterday on the sleeves. I'll be wearing this next week already. I don't plan on blocking this one.



New Projects.... have started the Christmas gift knitting.. not naming what or who, just posting a picture of what I have so far. It involves three rows of cabling, the cable stitch I borrowed from another published pattern, and changed it to make my own design.




and then... working on my first 'Mystery knit'. The designer posts one set of directions each week and without a picture or diagram, you knit and see what happens. These are socks with Knit Picks Gloss sock yarn in the color 'pumpkin'. How appropriate is that for a Socktober challenge. So far I have the first cuff done, the second sock being wokred on and the next set of directions for the leg will be posted in 2 days.